2 min read

The concept of waste in lean is quite different from the general description of it. In lean manufacturing, waste is any item or endeavor that is spent but that does not contribute to the conversion of raw materials into the product that the consumer is paying for. Waste, according to lean, is not just solid, fluid, emissions, or releases; it can be anything else including inventory, skills, unneeded motion and others which do not add values to the final product and are just not needed by the customer.

Therefore, we can safely conclude that waste, according to lean management is more of a non-tangible cost which the company is bearing, without adding values to the customers and are not being paid for by them.

Lean thinking focuses on wastes from work processes. In simple terms, from lean perspective, waste is any measure or step in a process that does not add values to the end-customer.

There are three (3) broad categories of waste in lean management – mura, muri and muda.

Click Here to Join the Over 560 Students Taking Highly Rated Courses on Quality Assurance/Quality Control, Food Safety, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, Product Development etc. on UDEMY.

  • Mura

Mura also refers to unevenness, waste due to fluctuated demands. For instance; in a particular month there was a high demand of a particular product and in the month that followed there was no demand, but due to bull-whip effect the organization has produced a lot considering that there will be demand in the subsequent months as well. However, due to decreased demand there was unneeded stock or inventory that needed to be cared of. The company needs to bear the cost. That is waste.

  • Muri

Muri could also be called overburdening; it is one of the three categories of waste. Working too much at a particular point in time with idleness at other point, amounts to imbalance in the use of time, resources and/or energy. This can also apply to employees or machinery. For instance, a group of employees are overburdened on a particular task and another group of employee under-utilized at the same period of time.

  • Muda

Muda also means the in-process waste. It is the biggest and most popular concept of Lean waste. It is the conventional target of “process improvement,” for instance having ten different steps in a company's process when simply four steps are actually required. This kind of waste is further classified as TIMWOODS, which represents waste in Transportation, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and Skills.

Click Here to Join the Over 560 Students Taking Highly Rated Courses on Quality Assurance/Quality Control, Food Safety, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, Product Development etc. on UDEMY.


About the Author

Adebayo is a thought leader in continuous process improvement and manufacturing excellence. He is a Certified Six Sigma Master Black Belt (CSSMBB) Professional and Management Systems Lead Auditor (ISO 9001, 45001, ISO 22000/FSSC 22000 etc.) with strong experience leading various continuous improvement initiative in top manufacturing organizations. 

You can reach him here.

Comments
* The email will not be published on the website.