Cellular Manufacturing is a method of producing similar products using cells, or groups of team members, workstations, or equipment, to facilitate operations by eliminating setup and unneeded costs between operations. Cells might be designed for a specific process, part, or a complete product. 

They are favorable for single-piece and one-touch production methods and in the office or the factory. Because of increased speed and the minimal handling of materials, cells can result in great cost and time savings and reduced inventory. Cellular design sometimes makes use of group technology, which studies a large number of components and separates them into groups with similar characteristics. 

They also uses families-of-parts processing, which groups components by shape and size to be manufactured by the same people, tools, and machines with little change to process or setup. Irrespective of the design of cell (straight line, u-shape, or other), the equipment in the cell are placed very near one another to save space and time. In cellular design, the handling of materials can be by hand, conveyor, or robot. A cell supervisory computer must be used to control movement between equipment pieces and the conveyor when robots or conveyors are used.

Click Here to Join the Over 2000 Students Taking our Highly Rated Courses on Quality Assurance/Quality Control, Food Safety, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, Product Development etc. on UDEMY.


Meaning of a Cell

A cell refers to a combination of people, equipment, and workstations organized in the order of process flow, to manufacture all or part of a production unit. The features of a cell include the following: 

  • It has one-piece, or very small lot, flow.
  • It is often used for a family of products.
  • It has equipment that is right-sized and very specific for this cell.
  • Is usually arranged in a C or U shape so the incoming raw materials and outgoing finished goods are easily monitored.
  • Have cross-trained people for flexibility.


Objectives of cellular manufacturing

The following are some core objectives of cellular manufacturing: 

  • To reduce manufacturing lead times. This can be achieved by reducing setup, work part handling, waiting times, and batch sizes.
  • To reduce Work in Process (WIP) inventory. Smaller batch sizes and shorter lead times reduce work-in-process.
  • For improvement of quality. This is accomplished by allowing each cell to specialize in making a smaller number of different parts thereby reducing process variability.
  • To simplify production scheduling. The system simply schedules the parts, rather than scheduling parts through a sequence of machines in a process-type shop layout,
  • To reduce setup times. Accomplished by using group tooling (cutting tools, jigs, and fixtures) that have been designed to process the part family rather than part tooling, which is designed for an individual part. This reduces the number of individual tools required as well as the time to change tooling between parts.


Click Here to Download Readymade Editable Toolkits & Templates on Quality Assurance/Quality Control, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, HSSE, Project Management etc.


Steps for Creating Continuous Flow Manufacturing Cells

After mapping out your value streams, you are ready to setup continuous flow manufacturing cells. Most cells that have been set up in the past ten years do not have continuous flow; most changes to cells have been a layout change only. That is, machines were moved in a cellular arrangement and nothing more was changed. It should be noted that change in layout alone does not create continuous flow. The following are some seven (7) steps for creating a continuous flow manufacturing cells: 

  • Decide which products or product families will go into your cells, and determine the type of cell

 For product focused cells to work correctly, demand needs to be high enough for an individual product. For mixed model or group technology cells to work, changeover times must be kept short. 

  • Calculate Takt Time

 Takt time, sometimes mistaken for cycle time, isn't dependent on your productivity- it is a measure of customer demand expressed in units of time. 


Click Here to Download Readymade Editable Toolkits & Templates on Quality Assurance/Quality Control, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, HSSE, Project Management etc.

  • Determine the work elements and time required for making one piece

 In much detail, document all of the actual work that goes into making one unit. Time each element separately several times and use the lowest repeatable time. Do not include wasteful elements such as walking and waiting time. 

  • Determine if your equipment can meet takt time

 Using a spreadsheet, determine if each piece of equipment that will be required for the cell you are setting up is capable of meeting takt time. 

  • Create a lean layout

 More than likely, you will have more than one person working in your cell (this depends on takt time); however, you should arrange the cell such that one person can do it, thereby ensuring that the least possible space is consumed. Less space translates to less walking, movement of parts, and waste. U-shaped cells are generally best; however, if this is impossible due to factory floor limitations, other shapes will do. 

  • Balance the cell

 This involves determining how many operators are needed to meet takt time. 

  • Determine how the work will be divided among the operators

 There are several approaches. Some include: 

  1. Splitting the work evenly between operators.
  2. Having one operator perform all the elements to make a complete circuit of the cell in the direction of material flow.
  3. Reversing the above.
  4. Combinations of the above.

After you’ve determined the above 7 elements, you will have gathered much of the necessary data required to begin drawing and laying out your continuous flow manufacturing cell.

Click Here to Join the Over 1800 Students Taking our Highly Rated Courses on Quality Assurance/Quality Control, Food Safety, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, Product Development etc. on UDEMY.


About the Author

Olanrewaju, Adebayo Bamidele is a Lead Auditor of ISO 9001, FSSC 22000 / ISO 22000, 14001 & 45001 Management Systems, Certified Six Sigma Master Black Belt (CSSMBB), process engineer, and quality management professional with strong working experience and proven skills in manufacturing excellence, ISO management systems implementation, lean / digital manufacturing, and project management. 

Adebayo is a Corporate Member of American Institute of Chemical Engineers (AIChE), Associate Member, the Institution of Chemical Engineers (IChemE), Corporate Member, Nigerian Society of Engineers (NSE), Corporate Member, Nigerian Society of Chemical Engineers (NSChE), Associate Member, Nigerian Institute of Management (NIM), and Associate Member, Institute of Strategic Management of Nigeria (ISMN).

He is an author of over 15 books and has published over 45 online courses on various e-learning platforms including UdemyAlison, Learnformula & Study Plex.

You can reach him, here.

कमैंट्स
* ईमेल वेबसाइट पर प्रकाशित नहीं किया जाएगा।