One Piece Flow is one of the key elements with which an organization can become lean. To think of processing one unit at a time usually sends a shudder through the organization which has batch manufacturing as its life blood. The word “one” does not mean one in the literal sense but in terms of customers’ requirements. In this sense, it means that the organization only process what the customer wants, in the quantity he wants and when he wants it.
One piece flow is simply a methodology for manufacturing components in a cellular environment (an area where everything that is needed to process the part is within easy reach, and no part is allowed to go to the next operation until the previous operation has been completed).
The goal of one piece flow is to make one part at a time correctly all the time without unplanned interruptions and lengthy queue times.
Click Here to Join the Over 1000 Students Taking our Highly Rated Courses on Quality Assurance/Quality Control, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, Product Development etc. on UDEMY.
While One-piece flow describes the sequence of product or of transactional activities through a process one unit at a time, batch processing creates a large number of products on a large number of transactions at one time – sending them together as a group through each operational step. The focus of One-piece flow is on employees’ efforts on the manufacturing process itself rather than on waiting, transporting products, and storing inventory.
It enables the production process flow smoothly, creating a steady work-flow for all employees involved. One-piece flow methods best functions with short changeover times and in a pull system environment.
There following are some advantages of incorporating one piece flow method into work processes:
One piece flow is simply a methodology for manufacturing components in a cellular environment (an area where everything that is needed to process the part is within easy reach, and no part is allowed to go to the next operation until the previous operation has been completed).
Click Here to Join the Over 1000 Students Taking our Highly Rated Courses on Quality Assurance/Quality Control, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, Product Development etc. on UDEMY.
The number of units you produce should equal the number of items your customers order. In other words, your selling cycle time should equal your manufacturing cycle time.
This involves deciding which products or product families will go into the cells, and determining the type of cell - Product-focused or mixed model. For product focused cells to work correctly, demand needs to be high enough for an individual product. For mixed model cells to work changeover times must be kept short; a general rule of thumb is that changeover time must be less than one tact time.
The next step is to calculate tact time for the set of products that will go into the cell. Tact time is a measure of customer demand expressed in units of time.
It is calculated as follows:
Takt time = Available work-time per shift / Customer demand per shift
In greater detail, each step and its associated time should be listed. Each step should be timed separately several times with the lowest repeatable time used.
Changeover time, load and unload times, and downtime should all be considered.
Design a layout using the principles of 5S which involves eliminating items that are not needed and locating all items/equipment/materials that are needed at their points of use in the proper sequence. Very limited space between processes within a one-piece flow cell is needed to eliminate motion waste and to prevent unwanted WIP accumulation. U shaped cells are generally best; however, if this is impossible due to factory floor limitations, other shapes will also suffice.
This can be done by determining how many operators are needed to meet tact time and then split the work between operators.
The formula below can be used:
Number of operators = Total work content / Tact time
In most cases, an “inconvenient” remainder term will result (e.g., you will end up with Number of Operators = 4.4 or 2.3 or 3.6 instead of 2.0, 3.0, or 4.0). If there is a remainder term, you may consider applying kaizen techniques to the process and reducing the work content. You may also consider moving operations to the supplying process to balance the line.
Click Here to Join the Over 1000 Students Taking our Highly Rated Courses on Quality Assurance/Quality Control, Lean Six Sigma, Lean Manufacturing, Six Sigma, ISO 9001, ISO 14001, ISO 22000, ISO 45001, FSSC 22000, Product Development etc. on UDEMY.
Adebayo is a thought leader in continuous process improvement and manufacturing excellence. He is a Certified Six Sigma Master Black Belt (CSSMBB), Digital Manufacturing Professional and ISO Management Systems Lead Auditor (ISO 9001, 45001 & ISO 22000) with strong experience leading various continuous improvement initiative in top manufacturing organizations.